How is frost heave prevented?Answer:![]() The standard method is to anchor the post down by digging a large hole to or below the frost line. The shape of the hole is an upside down "T." The hole must be deeper and wider at the bottom than at the top. This is difficult to do with a shovel, but is typically required by building codes. If this is not done correctly, there will be heaving over time which could damage your structure. Categories: |




Add comment